Evaluation of Filming

There was one very obvious thing that went wrong with our filming, We assumed that we would be allowed to film on site at Addenbrooke's, However, 10 to 15 minutes into our filming someone came and told us that as we had not got permission we had to leave immiedietly and record over everything we had filmed. Next time we need to make sure we have permission as it was a good location. After that we came back to School to film and found a location that was ok, but it was not ideal, but we had no choice due to time. We were able to get suitable footage, which could be better however. I feel it is obvious that it was very rushed. Next time we simply need to be better organized. The filming at my house took a little longer that i first anticipated, but I was still able to get a lot of footage to work with. There were only a couple of hitches, my cameraman was too short for the camera, but that was easily sorted, setting up the scenes needed more thinking than I thought it would, and the camera ran out of battery and it took a while to work out how to plug it into the wall. Overall I thought it was stressfull but successful, need better organization.

Labels:

0 Comments:

Post a Comment

<< Home

U1-31 : THRILLER PROJECT 2008/9